Many factories. One chain of responsibility.
A real lighting project spans eight suppliers — luminaires, drivers, control gear, cables, connectors, emergency units, mounting hardware. We coordinate all of them under one specification, one gate system and one project archive. You still contract each factory directly. We still never touch the money.
Projects don't fail at a factory. They fail between factories.
The interfaces — who supplies what to whom, on which date, to which standard — are where projects actually break.
Eight suppliers, eight excuses.
The luminaire maker blames the driver vendor. The driver vendor cites your spec. The module maker blames the bin. Nobody owns the interface.
The container mixes five purchase orders.
And nobody verified what actually went inside. Missing spare drivers, wrong cable grade, emergency units from a batch nobody gated.
Compliance breaks at category level.
Cable CPR class, connector EN 61984, emergency lighting EN 60598-2-22 — the adjacent categories that no luminaire audit ever covered.
One specification. Gates everywhere. One archive.
Each factory runs its own gates. The consolidation — merged container, unified documents, one master file — is what we add.
Consolidated specification
One lifetime-chain specification across all categories: luminaires, drivers and spares, control gear / DALI gateways, cables & connectors, emergency units, mounting hardware.
Per-category sourcing
Shortlist per factory, aligned quotes across categories — deviations registered, interfaces mapped.
Gates at every factory
Golden sample → FAI → mid-line → pre-shipment, at each plant. Adjacent categories verified per their own standards.
Consolidated inspection & loading
One overall check against the master checklist, then a merged container — coordinated with your nominated freight forwarder.
One project master file
Unified documents: every specification, every gate, every factory, every container — one archive, retained 24 months.
The whole cooperation on one page.
Lanes are the parties. Left to right is time. Dashed orange lines are money flows — note that none of them passes through our lane.
Project-level deliverables, on top of every factory's gates.
Everything from Managed Project Sourcing, per factory — plus the consolidation layer:
Project-level engagement, project-level terms.
The economics build on Managed Project Sourcing, extended to every factory in the project.
Every fee is stated before the project starts. You contract and pay each factory directly.
Independence survives project size.
The bigger the project, the more this list matters.
Have a project with more than one factory?
Put the whole project on the table.
How many suppliers, what ships together, where the interfaces are. The reply maps the responsibility chain and quotes the integration layer as one fixed fee.
Consolidated Project Procurement
One form for this service. The engineer who would run the case reads every message — no autoresponder, no newsletter, no sales sequence.
- 01First reply within 24 hours, Mon–Fri.
- 02Scope and a fixed price before any work starts.
- 03Your details stay yours — GDPR-compliant, deletable on request.