Your quality advocate and technical procurement arm in China.
Guangzhou, China · GMT+8 ENDE
Steve LightVerified
Service 01 · Supplier Assessment

Before you place the next order, know exactly what you are buying.

A fixed-price, buyer-side factory audit built specifically for LED lighting suppliers. Six capability domains, evidence from the production floor, and a verdict you can act on — not a checklist with photos.

Fixed all-in priceReport in 3 working daysValid 12 monthsBuyer-side only
01 / The situation

Three ways LED buyers get hurt before the first container.

These are the failure modes we see most often in European lighting procurement. If one of them sounds familiar, this service was built for you.

FAILURE MODE 01

The certificates look perfect.

ISO 9001 from a body that cannot be found, test reports naming a different model, a quality manual written for the audit — not for production.

→R1 red flag: every certificate is checked against the issuing body's database before you pay a deposit.
FAILURE MODE 02

The first order was fine. The second wasn't.

Mid-production, a new driver series appears, the capacitor brand changes, and nobody informed you. Reorder risk lives in change control.

→Capability 5 — change control, failure analysis and complaint handling — is audited as a first-class domain, not a footnote.
FAILURE MODE 03

The last audit report told you nothing.

Equipment lists, photo albums, tick boxes. Descriptive, not judgmental. You still don't know whether to place the order.

→The SAR ends in a quadrant verdict — A-Strategic, B-Craftsman, C-Compliant or D-Exit — plus red flags R1–R9 and what to do about them.
02 / How it works

From a factory name to a verdict, in five steps.

Everything before the audit is desk work and included. The audit itself is one day on site. The report reaches you three working days after.

STEP 1

Supplier Fact Sheet

Free, within 48 hours. Registration data, export footprint, litigation and penalties, certificate database checks.

OUT · SFS (free)
STEP 2

Scope & fixed quote

We collect your audit requirements and return a fixed all-in price. No daily rates, no extras.

OUT · ARCF + QUO
STEP 3

On-site audit

One day at the factory. Lead auditor with IATF 16949 background plus a lighting specialist. Six capability domains. Unannounced option available.

OUT · evidence log
STEP 4

SAR verdict

Delivered within 3 working days. Quadrant judgment, red flags R1–R9, Risk-Equivalent Control options, order-fit profile.

OUT · SAR
STEP 5

Valid for 12 months

The report stays valid for a year. Re-audit within that window: −40–50%.

OUT · re-audit window
03 / Working together

The whole cooperation on one page.

Lanes are the parties. Left to right is time. Dashed orange lines are money flows — note that none of them passes through our lane.

YOUBUYERSTEVE LIGHTVERIFIEDFACTORYYOURequestsend a factory nameSTEVE LIGHTVERIFIEDFact Sheetfree · 48 hYOURequirementsaudit scope · ARCFSTEVE LIGHTVERIFIEDFixed QuoteUSD 800–1,200 all-inYOUApprovefixed price · no extrasSTEVE LIGHTVERIFIEDOn-siteAudit1 day · IATF + lightingFACTORYAuditedrecords · line · peopleSTEVE LIGHTVERIFIEDSAR Verdictquadrant + R1–R9 · 3 daysYOUOrder Decisionre-audit −40–50% ≤12 mofactory nameyours in 48 hscopefixed priceauditors dispatched1 day on siteevidenceverdict in 3 days
04 / What you receive

Three documents. One verdict.

No 40-page photo albums. Each document has a job to do in your buying decision.

SFS · FREE
Supplier Fact Sheet
Delivered within 48 hours of your request, before any payment. Registry data, export footprint, litigation and administrative penalties, certificate verification against issuing databases.
QUO
Scope Preview & Quotation
Fixed all-in price (USD 800–1,200 depending on six scope factors), 30-day validity, explicit list of what is and isn't in scope.
SAR
Supplier Assessment Report
The verdict. Six capability scores (module A: can it build — domains 1–4; module B: can it hold — domains 5–6), quadrant judgment, red flags R1–R9, Risk-Equivalent Control recommendations, and an order-fit profile for your order type. Valid 12 months.
Sample / Inside the deliverable

We don’t show client names. We show the instrument.

Below is the on-site audit checklist our assessments are actually written on — an anonymized excerpt from a pure-assembly downlight audit. Capabilities 1, 3 and 5 shown; 2, 4 and 6 removed. Scroll in the frame to read it the way the factory floor saw it.

How to read the codes

✓Acceptable as found
⚠Concern — affects the score
✗Non-conformance — major gap
R?Suspected red flag — escalated before leaving the plant

Every ⚠ and ✗ carries a photo reference. Findings are written on the floor, in one line, same day.

What this is — and isn’t

The checklist structure, wording and codes are our real working document (v1.1). The findings shown are representative of a typical pure-assembly downlight audit — anonymized, not a client’s file. We issue deliverables in English; the sample keeps the working language.

What’s removed

Capabilities 2, 4 and 6 — supply chain & incoming inspection, testing & NPI, technical file & compliance. Also removed: factory identity, the scores, the quadrant verdict and the photo log. Clients receive all of it, plus the SAR report three working days after the audit.

Request the complete redacted sample →

Sample · Anonymized & redacted — not a client file
On-Site Audit Checklist
Internal working document — carried on the factory floor, filled live, feeds the SAR report.
Case fileSAR-25■■-■■  ·  linked: QUO-25■■-■■ · SFS-25■■-■■
Factory[Redacted] — LED downlight pure-assembly plant, Pearl River Delta
Target productLED downlights 7–12 W · pure assembly (no SMT on site)
Order typeStandard repeat order
Audit[Redacted] · 1 day on site · announced
AuditorsLead quality engineer · lighting specialist
Versionv1.1 — Six-Capability Base (internal working document)
Capability 1 · Product Engineering & Designshown
Deepen for project orders. Thin design capability is not automatically disqualifying — it shapes the quadrant and the control plan.
#Check itemHow to verifyFindingPhoto
1.1Design in-house, co-developed, or build-to-print? Design inputs (spec interpretation, DFM review) on record?Ask the design process; pull the latest DFM / design-review record⚠ Build-to-print. No DFM records; drawing interpretation confirmed by e-mail only.P01
1.2Driver selection logic: current margin vs rated; who decides the margin and by what ruleDriver datasheet vs actual load; name the decision-maker and the ruleN/A Selection fixed by the customer’s spec — no in-house decision to audit.—
1.3Thermal design: Tj / Tc determination method; design basis for the thermal path (housing, TIM, heatsink)Thermal calculation or measurement report; check Tc-point marking⚠ No thermal design on site; assembly file carries no Tc-point marking.P02
1.4Structural details: sealing method & gasket compression · breather · surge element · cable glandTeardown a sample and check each: compression even? MOV rating vs driver spec⚠ MOV rating matches driver spec; gasket compression unchecked at any station.P03
1.5Optics: lens / reflector bought-in; procurement spec bans regrind?Check the resin UV grade spec; ask whether the purchase spec prohibits regrind⚠ Purchase spec does not prohibit regrind resin.P04
1.6Golden-sample control: approval, sealing, validity, change triggerInspect the golden sample and its register: who approved? when last re-checked?⚠ Register exists; last re-check 14 months ago.P05
1.7Sample consistency: submitted sample, FAI sample, production unit mutually verifiablePull one unit from each and compare key features✓ All three match on key features.—
🔒 Capability 2 · Supply-Chain Management & Incoming Inspection — REDACTED IN THIS SAMPLE · INCLUDED IN THE FULL REPORT
Capability 3 · Volume Production Organisation & Managementshown
Deepen for standard repeat orders. Paper on the wall scores lower than a thin system honestly used.
#Check itemHow to verifyFindingPhoto
3.1Process flow obtained and walked end-to-end (incoming → assembly → aging → packing)Walk the actual flow; note any step the flow chart omits⚠ One rework loop after aging is missing from the flow chart.P06
3.2In-house vs subcontracted steps mapped (SMT · die-casting · coating · optics · assembly)Ask, then confirm on the floor — cross-check red flag R7✓ SMT and die-casting subcontracted — disclosed; consistent with R7.—
3.3Real line count and current utilisation vs claimed capacityCount lines running today; ask what is idle and why✓ 4 lines claimed, 2 running today (~55%); idle lines awaiting season.—
3.4Equipment condition as found (nameplates · maintenance state · wear · dust)Photo nameplates of key equipment; note mismatch vs claims⚠ One of two torque drivers past its calibration due date.P07
3.5Jigs, fixtures and test stations present for the target productAsk them to show the fixture for YOUR product, not a similar one⚠ Press fixture shown — shared with another model, unlabelled.P08
3.6Operator skill at critical stations (soldering · sealing · TIM application)Watch 10 minutes at each critical station; note method vs work instruction✓ TIM applied manually; operator method matches the work instruction.—
3.7Control plan / work instructions actually used on the lineTake the control plan to the line: does the operator/inspector know it?⚠ Inspector knows the control plan; line operators do not.P09
3.8WIP and finished-goods identification and housekeepingPhoto; check labels carry model + lot✓ Labels carry model + lot; housekeeping orderly.—
3.9Traceability test: finished unit → component lots (record the depth achieved)Pick a finished unit at random and trace back; record where the chain breaks⚠ Unit → lot traces; chain breaks at the bought-in light engine (see Capability 2).P10
3.10Best batch size (their sweet spot, from the floor — not their claim)Ask current running batch size and changeover frequency✓ Sweet spot 500–2,000 pcs; changeover ≈ 40 min.—
🔒 Capability 4 · Testing, Reliability Verification & NPI — REDACTED IN THIS SAMPLE · INCLUDED IN THE FULL REPORT
Capability 5 · Engineering Change Control, Failure Analysis & Complaint Handlingshown
This capability decides whether “good this time” becomes “good every time”.
#Check itemHow to verifyFindingPhoto
5.1ECN process in use: change request → review → verification → notification → release recordPull the last 2 ECNs; check every step has a record and notification actually went out⚠ One of the last two ECNs lacks the customer-notification record.P11
5.2Substitution control: AVL management and change approvalTrace one recent substitution case: AVL update, verification test, customer confirmation⚠ AVL updated after the new part was already in use.P12
5.3Change vs compliance: how a component swap is kept from breaking RoHS / certificationCheck the compliance re-check in the latest change record✗ No compliance re-check on record at the last component swap.P13
5.4One 8D traced end-to-end (containment → root cause → verification → closure)Pick a real customer complaint; verify the fix is verifiable, not a promise⚠ Containment done; root cause stops at “operator error”.P14
5.5Complaint register: intake, statistics, closure rate, repeat-issue identificationIs the register alive — statistics and reviews, or just a log?✓ Register alive — monthly statistics and review.—
5.6Field-failure sample retention and analysis capabilityAsk whether failed units are kept for analysis; see the tools and records⚠ Failed units kept in one box; no analysis tools or records.P15
5.7Post-change batch segregation from pre-change batchesCheck warehouse and WIP: can pre/post-change batches be told apart at a glance?✓ Pre/post-change batches distinguishable at a glance.—
🔒 Capability 6 · Technical File & Compliance Documentation — REDACTED IN THIS SAMPLE · INCLUDED IN THE FULL REPORT
Full checklist ships with every engagement: all six capabilities, the R1–R9 red-flag register, the scoring sheet and quadrant verdict, the order-fit profile and the complete photo log — plus the SAR report three working days after the audit.
05 / Scope & pricing

One price, stated before we start.

The price depends on six scope factors (factory size, product range, certification status, travel distance, order type, language). You see the number before you commit.

Assessment · 1 factory
Six capability domains, full SAR report, evidence archive
USD 800–1,200 all-in
Unannounced (raid) audit
Same scope, zero factory preparation time
+20–30%
Second factory, same region
Scheduled back-to-back within the same trip
−30%
Re-audit within 12 months
Focused on previous findings and change areas
−40–50%

Travel within the Pearl River Delta lighting cluster is included. No daily rates. No hidden fees.

06 / What we don't do

Boundaries that make the verdict trustworthy.

A report is only as good as the conflicts it refuses. These refusals are contractual, not stylistic.

✕No BSCI / Sedex / social compliance audits — we are a technical practice, not a compliance body.
✕No certification work — we don't issue CE, ENEC or any product certificate. We verify the ones that exist.
✕No financial due diligence — we assess what a buyer can act on: capability and risk.
✕No factory-paid services — our fee comes from you, or it doesn't come at all.
✕No consulting for the audited factory — for 12 months after an assessment, we won't work for the factory we audited.

Start with the free Supplier Fact Sheet.

Send us one factory name. Within 48 hours you will know more than after a week of email exchange — registry data, export history, litigation, certificate checks. Free, and yours to keep.
07 / Enquiry

Ask about a factory you are about to order from.

One factory name is enough to start. Tell us what you buy and what worries you — the reply tells you what the assessment would cover and what it costs.

Enquiring about

Supplier Assessment

One form for this service. The engineer who would run the case reads every message — no autoresponder, no newsletter, no sales sequence.

  • 01First reply within 24 hours, Mon–Fri.
  • 02Scope and a fixed price before any work starts.
  • 03Your details stay yours — GDPR-compliant, deletable on request.
Request noted. Your Supplier Fact Sheet reaches you within 48 hours (Mon–Fri). No newsletter, no sales call unless you ask for one.